BR-Sao Paulo Metro Line 4 - Additional Financing
Approval Date
Apr. 8, 2008
Status
Closed
Closing Date
NA
Amount
$95M
Displacement:
Confirmed
People displaced (estimated)
129
Additional details
- Environmental category: A (project with high environmental and social risk)
- The project has a resettlement action plan/abbreviated resettlement plan, which was produced by the time the project was approved.
- Connected World Bank project(s) with resettlement issues, with a total additional cost of $130,000,000: BR-S'O Paulo Metro Line 4 Project -- P051696,BR-S'O Paulo Metro Line 4 (Phase 2)
- This project provides additional financing for a project not included in this database because it did not cause displacement, according to World Bank documents.