Evicted and Abandoned

Indonesia

Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project

Country: Indonesia
Sector: Energy and mining
Approval Date
May. 26, 2011
Status
Active
Closing Date
Dec. 31, 2018
Amount
$640M
Displacement:
Confirmed
People displaced (estimated)
8.2K
Additional details
  • Environmental category: A (project with high environmental and social risk)
  • The project has a resettlement action plan/abbreviated resettlement plan, which was produced by the time the project was approved.
More details at worldbank.org