Evicted and Abandoned

Ivory Coast

WAPP APL4 (Phase 1) - Côte d'Ivoire; Sierra Leone; Liberia; and Guinea Power System Re-development

Approval Date
May. 31, 2012
Status
Active
Closing Date
Dec. 31, 2017
Amount
$176M
Displacement:
Confirmed
People displaced (estimated)
710 (Liberia), 112 (Guinea), 692 (Côte d’Ivoire), 3.3K (Sierra Leone)
Additional details
  • Environmental category: A (project with high environmental and social risk)
  • The project has a resettlement action plan/abbreviated resettlement plan, which was produced by the time the project was approved.
More details at worldbank.org